17 July 2018 |by Nicolas Mangon An unfortunate fact of the AEC (architecture, engineering, and construction) industry is that, between every stage of the process—from planning and design to construction and operations—critical data is lost. The reality is, when you move data between phases of, say, the usable lifecycle of a bridge, you end up shuttling […]